Features

MoveKore Features: Every Tool for Commercial Moving Projects

From pre-move survey to QuickBooks invoice — MoveKore is purpose-built for the complexity of corporate relocation.

Dashboard

Every project, one screen

The project command center shows financials, phase status, compliance health, change orders, and the audit log — all in real time. PMs know exactly where every job stands before the morning call.

  • Live financial summary (base + COs + credits)
  • Phase completion percentage
  • Health score (Healthy / Watch / At Risk)
  • Immutable audit log for every action
Acme Corp HQ Relocation
MK-0091 · 5 phases · PM: Dana R.
Active
$184,500
Base Contract
+$14,800
+ Change Orders
$199,300
Final Est.
Phase Progress
Pre-Move Survey100%
Floor 12 — IT Room100%
Executive Suites 10–1462%
Common Areas & Lobby0%
Final Walk & Cert0%
Health Score
87
Healthy
Recent Audit
· CO-007 signed by client
· Phase 2 marked complete
· 14 photos uploaded
Quote #QT-0044
Acme Corp · Created 05/12/2026
Draft
ItemQtyTotal
Foreman (8h × $85/h)2$1,360
Crew (8h × $55/h)6$2,640
26-ft Truck2$900
Packing Materials1$420
Overtime Multiplier (1.5×)—$600
Quote Total$5,920
Quoting

Quotes that become contracts

Rate card presets let PMs build accurate quotes in minutes. Add line items, apply overtime multipliers, and send for client e-signature via Dropbox Sign. When the client signs, compliance items auto-generate.

  • Rate card presets (foreman, crew, truck, materials)
  • Line-item editing with live total
  • Dropbox Sign e-signature integration
  • Auto-generates compliance checklist on signing
Field Tools

Documentation that protects you

Every photo is GPS-tagged, timestamped, and linked to the exact space and phase. Annotate with pen, arrows, and circles. Compare before/after per space. Flag damage photos for immediate escalation.

  • 3-tap photo capture from mobile
  • GPS + device timestamp attached automatically
  • Space and phase tagging
  • Pen / arrow / circle annotation tool
  • Before/after comparison view
  • Flagged photo escalation
Executive Suite 4B — Before
Phase 2Suite 4B
07:14 AM · 41.8781° N
Executive Suite 4B — After
Phase 2Suite 4B
04:38 PM · 41.8781° N
Server Room — Damage Flagged
Phase 1Floor 12 IT
09:02 AM · 41.8783° NFlagged
Lobby — Elevator Pad Setup
Phase 4Lobby
08:47 AM · 41.8780° N
Change Order CO-009
MK-0091 · Submitted 05/13/2026
Pending Signature
Reason Code
Scope Addition
Access Delay
Damage Repair
Overtime
Description
Additional packing materials required for server room — fragile rack equipment not included in original scope.
CO Amount+$2,850.00
Client Signature
Awaiting client signature via portal
Approved COs auto-add to invoice total on signature
Change Orders

No more unsigned COs

Reason-code tiles let crew describe the reason fast. PMs add amounts and send to the client portal. Clients sign on their phone. Approved COs auto-add to the final invoice total.

  • Reason codes: scope addition, access delay, damage repair, overtime
  • Canvas e-signature (or Dropbox Sign)
  • Client portal signing — no login required
  • Auto-adds to billing total on approval
Client Experience

Clients stay informed, not in your inbox

Every project gets a tokenized portal link. Clients see phase progress, approve COs, accept punch list items, and download completion certificates — all without creating an account.

  • No login required — tokenized URL
  • Real-time phase progress
  • CO approval with digital signature
  • Punch list acceptance
  • Progress photos (non-flagged)
  • Completion certificate download
Client Portal
Acme Corp · No login required
Live
Move Progress
Pre-Move Survey
Floor 12 — IT Room
Executive Suites 10–14In progress
Common Areas & Lobby
Final Walk & Cert
Action Required — Change Order
CO-009 — Additional packing materials for server room
+$2,850.00
Completion Certificate
Available after final sign-off
PDF
Final Invoice
INV-0091 · MK-0091 · Acme Corp
Ready to send
Invoice Summary
Base Contract$184,500.00
Change Order CO-007+$8,200.00
Change Order CO-008+$4,100.00
Change Order CO-009+$2,850.00
Credit — Access Delay−$350.00
Invoice Total
All amounts stored in cents
$199,300.00
QBO Invoice ID stored for reconciliation after push
Billing

From completion to invoice in one click

When the job is done, MoveKore calculates the exact total: base contract + approved COs − credits. Connect QuickBooks Online once. Push the invoice with a single click.

  • All amounts stored in cents — no rounding errors
  • Approved COs auto-calculate into final bill
  • One-click QuickBooks Online sync
  • QBO invoice ID stored for reconciliation
Safety

OSHA-compliant safety logs, built in

Commercial moving is hazard-dense: heavy lifts, elevator holds, occupied buildings, powered equipment. MoveKore turns paper safety documentation into a real-time, searchable record — per project, per phase, per crew.

  • Six log types: toolbox talks, near misses, incidents, hazard observations, equipment inspections, PPE checks
  • OSHA 300 recordability flag on every incident entry
  • Severity scale: none → minor → moderate → serious → critical
  • Followup queue — open items flagged until PM marks resolved
  • Safety incidents surface in dashboard action items automatically
  • Export safety log to CSV — ready to paste into your OSHA 300 log
Near misses should always be logged — they reveal hazard patterns before someone gets hurt.
Toolbox Talk
Near Miss
Incident
Hazard
Equipment
PPE Check
IncidentModerateOSHA 300Followup Open

Crew member strained lower back on stair climber in stairwell B.

Near MissMinorFollowup Open

Load shifted on dolly — no injury. No anchor strap used on tall cabinet.

Toolbox Talk

Back safety + proper lift technique. 7 crew present.

12 entries
This Project
2
Open Followups
1
OSHA Recordable
Works with
Dropbox Sign
E-signature
QuickBooks Online
Accounting
iOS + Android App
Field App
Calendar Sync
iCal · Google · Outlook
Email Notifications
Alerts + milestone emails

Start your free 14-day trial. No credit card, no setup fee.

Get your first project running in under 10 minutes. If you want a guided walkthrough first, book a 30-minute demo.

No credit card required · 14-day trial · Cancel anytime · Data export on request